Overview:
NTS Group were engaged to replace existing water reticulation mains at three (3) separate work locations across Gladstone, as a result of the assets reaching the end of their functional life.
A range of open cut, drilling & tunnelling techniques were used to install the new assets around existing features within the streetscape. NTS Group utilised their state of the art Aqualine bypass set-up to provide temporary water supply to facilitate the new permanent pipework install. The works were located in high-profile areas which required meticulous stakeholder management throughout the program.
Scope:
-
Service Investigations (in-house)
-
Comprehensive Detailed Survey (in-house)
-
Open Cut Trenching & Pipe Installations in verge, road pavement and footpath
-
Service connections & bypass arrangements
-
Horizontal Directional Drill (HDD) & Pipe-pulling
-
Valve & hydrant installations
-
Restoration of road, turf & concrete footpaths/driveways