Central Highlands Regional Council

Client

Principal Contractor

Role

$550k

Value

Overview:

Central Highlands Regional Council required rectification works to be carried out on 3 x Sewer Pump Stations. NTS Group were appointed as the Principal Contractor to augment these assets and extend their time in operation. The project involved several high-risk activities including –  confined space entry, working at heights, bypassing the sewer network & deep excavations. The crew delivered the project well ahead of schedule, which resulted in positive feedback from the client.

Scope:

  • Temporary sewer bypass arrangements in order to isolate the SPS assets from the network

  • Removal and replacement of existing pipework from the pumps in the wet well, through to the valve pit

  • Penetrations through wet well walls into the valve pits

  • Supply & installation of new flow meter pits

  • Replacement of existing valves & associated flanged pipework

  • Open Cut Trenching & Pipe Installations in verge, road pavement and footpath

  • Supply & installation of new lids, vent poles, electrical infrastructure

  • Restoration of road, turf & concrete footpaths/driveways