Overview:
Central Highlands Regional Council required rectification works to be carried out on 3 x Sewer Pump Stations. NTS Group were appointed as the Principal Contractor to augment these assets and extend their time in operation. The project involved several high-risk activities including – confined space entry, working at heights, bypassing the sewer network & deep excavations. The crew delivered the project well ahead of schedule, which resulted in positive feedback from the client.
Scope:
-
Temporary sewer bypass arrangements in order to isolate the SPS assets from the network
-
Removal and replacement of existing pipework from the pumps in the wet well, through to the valve pit
-
Penetrations through wet well walls into the valve pits
-
Supply & installation of new flow meter pits
-
Replacement of existing valves & associated flanged pipework
-
Open Cut Trenching & Pipe Installations in verge, road pavement and footpath
-
Supply & installation of new lids, vent poles, electrical infrastructure
-
Restoration of road, turf & concrete footpaths/driveways