Gold Coast Water & Waste

Client

Principal Contractor

Role

$4m

Value

Overview:

This project involved the augmentation of a section of an existing recycled water main between Pimpama STP and Coombabah STP. The Work involves installing OD660 and OD800 diameter pipeline, approximately 1.65 km in total length.

Scope:

  • Service Investigations (in-house)

  • Clearing & grubbing

  • Supply & Installation of OD660 above-ground MSCL pipework

  • Supply & Installation of OD800 open-cut pipework through RAMSAR wetlands

  • Connections to the existing recycled water network

  • High level dewatering management

  • Acid sulphate soil management throughout the project