Gold Coast Water & Waste

Client

Principal Contractor

Role

$2m

Value

Overview:

This project formed part of NTS Group’s D&C Pressure Mains Program and was completed in 2022. The scope was to extend the existing CoGC water network to businesses along Stapylton Jacobs Well Rd & Woolshed Rd, while also working with DTMR to ensure the new infrastructure was fit for purpose for the planned Coomera Connector project. This involved ~2.5km of DN200-500mm pipework which ranged from 1.5m to 5m in depth. Multiple DN500 HDD’s were required under DTMR roads, with intricate connections back to the open cut pipework. NTS Group successfully delivered all phases of this project – scoping, survey, investigations, approvals, design management, construction & commissioning.

Scope:

  • Service Investigations (in-house)

  • Comprehensive Detailed Survey (in-house)

  • RPEQ Certified Design & Management

  • Land access approvals & easement acquirements

  • Open Cut Trenching & Pipe Installations in verge, road pavement and footpath

  • Deep excavations (up to 5m deep)

  • Horizontal Directional Drill (HDD) (DN500)

  • Scour & air valve installations

  • Restoration of road, turf & concrete footpaths/driveways